Unicont SPb Ltd Battery control panel BCP-136 Operating manual (136-3-24102013) St. Petersburg 2013 v.3.4
Unicont SPb Ltd Operating manual BCP-136 Page 10 7. Installation and connection It is recommended to install and connect the battery panel in the
Unicont SPb Ltd Operating manual BCP-136 Page 11 Fig. 4 Console installation of the panel b) Wire connecting cables of external devices. Connect
Unicont SPb Ltd Operating manual BCP-136 Page 12 Fig. 6 Example of SB-138 connection to the analog interface Note! Prior to connect a battery to
Unicont SPb Ltd Operating manual BCP-136 Page 13 Fig. 7 Example of BMU-126 connection to the analog interface
Unicont SPb Ltd Operating manual BCP-136 Page 14 Assignment of PORT 1 and PORT 2 connector pins: Table 5. Assignment of PORT 1 and PORT 2 (type DB
Unicont SPb Ltd Operating manual BCP-136 Page 15 d) Configure the battery panel to receive information from external devices: 1 Battery panel ope
Unicont SPb Ltd Operating manual BCP-136 Page 16 8. Configuration 8.1 Panel menu In order to configure the battery panel for operation with exter
Unicont SPb Ltd Operating manual BCP-136 Page 17 Fig. 9. General structure of the service BCP-136 menu. Items of the battery panel menu and their
Unicont SPb Ltd Operating manual BCP-136 Page 18 Note! It is necessary to take into account that charging current and voltage (their maximal and m
Unicont SPb Ltd Operating manual BCP-136 Page 19 8.3 Battery panel configuration 8.3.1. Port operating mode configuration (enter the service men
Unicont SPb Ltd Operating manual BCP-136 Page 2 Table of Contents 1. GENERAL ...
Unicont SPb Ltd Operating manual BCP-136 Page 20 press ▲ and ▼ buttons simultaneously and hold them pressed for 5 seconds, until "Prt"
Unicont SPb Ltd Operating manual BCP-136 Page 21 8.3.8. Test function activation In order to check if the visual and sound elements (LEDs, indic
Unicont SPb Ltd Operating manual BCP-136 Page 22 Default configuration Setting Item Value PORT operating mode CH1 dCH CH2 OFF Factory (default) pa
Unicont SPb Ltd Operating manual BCP-136 Page 23 9. Transportation and Storage The divice shall be stored in heated space at air temperature of +5
Unicont SPb Ltd Operating manual BCP-136 Page 24 10. Recycling Do not recycle the packing of a new product, its parts with defects identified dur
Unicont SPb Ltd Operating manual BCP-136 Page 25 11. Warranty The manufacturer guarantees the unit BCP-136 complies with this manual provided tha
Unicont SPb Ltd Operating manual BCP-136 Page 26 12. DATE OF PACKING Battery control panel BCP-136 № name of article designation serial
Unicont SPb Ltd Operating manual BCP-136 Page 27 APPENDIX A SAILOR 6081 TO BCP-136 CONNECTION EXAMPLE Connection diagram The device is connected
Unicont SPb Ltd Operating manual BCP-136 Page 3 Battery control panel BCP-136 (hereinafter referenced to as battery panel, or panel) is intended f
Unicont SPb Ltd Operating manual BCP-136 Page 4 3. Technical specifications Table 1 - Specifications BCP-136 version ДИШУ.468262.001 ДИШУ.468262
Unicont SPb Ltd Operating manual BCP-136 Page 5 4. Principle of operation The battery panel is an electronic device, which consists of the followi
Unicont SPb Ltd Operating manual BCP-136 Page 6 Battery panel performs the following functions: selection of operating mode of connected batter
Unicont SPb Ltd Operating manual BCP-136 Page 7 5. Alarms Battery panel is equipped with built-in means of visual and sound alarming intended to a
Unicont SPb Ltd Operating manual BCP-136 Page 8 6. Controls and indicators Battery panel is equipped with the following controls and indicators:
Unicont SPb Ltd Operating manual BCP-136 Page 9 LED indicator Purpose BAT ALARM 1 (PORT 1) – if a digital interface is used (along with CH-105 or